Featured Past Projects

S/N Project Title
1 Repairs of Nos. Trash Skips as per BID#-CD-2003-040
2 Repairs of 2 Nos. Trash Skips as per BID#-CD-2003-040 Fabrication of 2nos Trash Skips
3 Repairs of 2 Nos. Trash Skips as per BID#-CD-2003-040
4 Fabrication of various Piping & Structural items as per Bid #-CD-2004-012.Well head Protector Frame
5 Frames as per BID#-CD-2005-010
6 Fabrication of 2 Nos. 24” Manhole
7 Fabrication of 4EA Wellhead Protection Frames as per BID#-CD-2005-010
8 Fabrication of 52EA Sub-Sea Clamps as per BID#-CD2005-004
9 Fabrication of 42 Nos. of 293mm Diameter Sub-Sea Clamps as per BID#CD-2005-042
10 Fabrication of Structural Components for Parabe Quarters Generator and Fire Pump Runway Beams and Deck Extension as per BID#-CD-2005-049
11 Fabrication of Ten (10 Nos.) MKIII Cutting Boxes as per BID#-CD-2005-032
12 Fabrication of Various Structural Member (Chevron)
13 Fabrication of North APOI Boat Landing Extension. (Chevron)
14 Fabrication of South Warehouse Access Stairway (Chevron)
15 Fabrication of 15EA Trash Skips as per CNL BID# -CDPH-2007-001.
16 Fabrication of Structural Members for the Repair of Pennington Living Quarters Boat Landing.
17 Fabrication of 4EA Shop Maintenance Stairway.
18 Fabrication, Blasting and Painting of 40 Nos. Top Sea and Sub Sea for Mon-Desol Ltd. – (CNL Project)
19 Olero RMP 6, GB2 and GB6 Flowlines, Structural and Topside Repairs for Origin Global Nig. Ltd. (CNL Project)
20 Fabrication of 3 Nos. Wellhead Platform Cages for SAABHUXTON Ltd. (CNL Project)
21 Olero Creek Restoration Project Labour and Equipment Supply for Piping and Miscellaneous Structural Works for Joepeaco Nig. Ltd. (CNL Project)
22 Fabrication and installation of skids and structural items at DIBI – SAMDACK Trust Ltd. (CNL Project)
23 Olero Creek Restoration Project WFS and ICP Firewater Systems Pipe – Samdack Trust Ltd. (CNLPROJECT)
24 Fabrication of Emergency Egress for Cleopatra House Boat (CNL Project)
25 Fabrication of support and Roof Structure over Nalco Portacabin.
26 Fabrication of various sizes of Environmental Waste Oil Storage Tank (10 Barrels, 20 Barrels, 50 Barrels and 100 Barrels Tank each) (CNL Project).
27 Fabrication of South Warehouse Access Stairway (CNL Project)
28 Fabrication of 10” Schedule 40 Manifold Header - (CNL Project)