| 1 |
Repairs of Nos. Trash Skips as per BID#-CD-2003-040 |
| 2 |
Repairs of 2 Nos. Trash Skips as per BID#-CD-2003-040 Fabrication of 2nos Trash Skips |
| 3 |
Repairs of 2 Nos. Trash Skips as per BID#-CD-2003-040 |
| 4 |
Fabrication of various Piping & Structural items as per Bid #-CD-2004-012.Well head Protector Frame |
| 5 |
Frames as per BID#-CD-2005-010 |
| 6 |
Fabrication of 2 Nos. 24” Manhole |
| 7 |
Fabrication of 4EA Wellhead Protection Frames as per BID#-CD-2005-010 |
| 8 |
Fabrication of 52EA Sub-Sea Clamps as per BID#-CD2005-004 |
| 9 |
Fabrication of 42 Nos. of 293mm Diameter Sub-Sea Clamps as per BID#CD-2005-042 |
| 10 |
Fabrication of Structural Components for Parabe Quarters Generator and Fire Pump Runway Beams and Deck Extension as per BID#-CD-2005-049 |
| 11 |
Fabrication of Ten (10 Nos.) MKIII Cutting Boxes as per BID#-CD-2005-032 |
| 12 |
Fabrication of Various Structural Member (Chevron) |
| 13 |
Fabrication of North APOI Boat Landing Extension. (Chevron) |
| 14 |
Fabrication of South Warehouse Access Stairway (Chevron) |
| 15 |
Fabrication of 15EA Trash Skips as per CNL BID# -CDPH-2007-001. |
| 16 |
Fabrication of Structural Members for the Repair of Pennington Living Quarters Boat Landing. |
| 17 |
Fabrication of 4EA Shop Maintenance Stairway. |
| 18 |
Fabrication, Blasting and Painting of 40 Nos. Top Sea and Sub Sea for Mon-Desol Ltd. – (CNL Project) |
| 19 |
Olero RMP 6, GB2 and GB6 Flowlines, Structural and Topside Repairs for Origin Global Nig. Ltd. (CNL Project) |
| 20 |
Fabrication of 3 Nos. Wellhead Platform Cages for SAABHUXTON Ltd. (CNL Project) |
| 21 |
Olero Creek Restoration Project Labour and Equipment Supply for Piping and Miscellaneous Structural Works for Joepeaco Nig. Ltd. (CNL Project) |
| 22 |
Fabrication and installation of skids and structural items at DIBI – SAMDACK Trust Ltd. (CNL Project) |
| 23 |
Olero Creek Restoration Project WFS and ICP Firewater Systems Pipe – Samdack Trust Ltd. (CNLPROJECT) |
| 24 |
Fabrication of Emergency Egress for Cleopatra House Boat (CNL Project) |
| 25 |
Fabrication of support and Roof Structure over Nalco Portacabin. |
| 26 |
Fabrication of various sizes of Environmental Waste Oil Storage Tank (10 Barrels, 20 Barrels, 50 Barrels and 100 Barrels Tank each) (CNL Project). |
| 27 |
Fabrication of South Warehouse Access Stairway (CNL Project) |
| 28 |
Fabrication of 10” Schedule 40 Manifold Header - (CNL Project) |